LogoRACK
Engineering Portfolio — 2026

The invisible rooms
holding the world together.

Data center architecture for enterprise IT directors, startup CTOs, and facilities teams — from the first U-space to the last fiber trench.

Megawatts Designed
0 MW

Critical power capacity engineered across all engagements

Facilities Delivered
0

From edge deployments to hyperscale campuses

Average PUE
0.00

Power usage effectiveness — industry benchmark is 1.58

Uptime SLA Achieved
0.000%

Five nines. Every project. No exceptions.

Scroll to explore
The Problems We Solve

The thoughts that wake you at 2 a.m.

Every one of these has a precise engineering answer. We've written it before.

Capacity Ceiling

Your racks are full and the business wants to double headcount by Q3.

The data center you inherited wasn't designed for this. Every expansion proposal gets blocked by power density limits no one documented.

Known failure mode

Cooling Bottleneck

Hot spots keep triggering thermal shutdowns on your densest rows.

Air management was an afterthought. Now you're watching $4M in compute throttle itself every afternoon because the cold aisle never got sealed.

Known failure mode

Compliance Drift

Three jurisdictions, four auditors, and nobody agrees on what Tier III actually means.

Uptime Institute, EN 50600, ASHRAE — each framework pulls in a different direction, and your next audit is in six weeks.

Known failure mode

Vendor Lock-In

One manufacturer controls your entire power path. Their lead time just went to 52 weeks.

Proprietary bus bars, proprietary PDUs, proprietary software. You can't get a second quote because nothing else fits the footprint they specified.

Known failure mode
Engineering Answers

The exhale after the problem.

Precision answers to each failure mode — designed, documented, and deliverable.

94%

Modular Expansion Planning

Build for today. Scale tomorrow without touching existing infrastructure.

We model five-year growth scenarios and design power and cooling headroom into every structural decision — so your next 200 racks cost a fraction of the first.

3.2×
avg. capacity multiplier at equal footprint
Answers: Capacity Ceiling
88%

CFD Thermal Modeling

We simulate airflow before a single tile is lifted.

Computational Fluid Dynamics modeling identifies hot spots, bypass air, and recirculation zones in your proposed layout — eliminating thermal surprises before commissioning.

0.31°C
average inlet temp variance from model
Answers: Cooling Bottleneck
91%

Jurisdiction-Mapped Compliance

One specification document, every framework, zero contradictions.

Our compliance matrix maps Uptime Institute Tier criteria, EN 50600, ASHRAE 90.4, and local code simultaneously — giving auditors a single source of truth.

14
regulatory frameworks covered by standard spec
Answers: Compliance Drift
97%

Open-Standard Specification

Your RFP goes to five vendors. All five can bid.

Every design we produce is written to open standards — ANSI/TIA-942, IEC 62040 — so no manufacturer owns your upgrade path. Competition keeps your capital budget honest.

22%
average capex savings vs. proprietary spec
Answers: Vendor Lock-In
Facility Assessment

Score Your Facility
in 3 minutes.

Three questions. A readiness score. A personalized summary before we ever ask for your contact details.

Facility Readiness Assessment

Three questions about your infrastructure. We'll return a readiness score and a personalized summary — then offer a 30-minute design review if the numbers suggest it.

3
Questions
3 min
Time
0
Emails first
Client Results

The relief of knowing someone
has already solved the hard part.

"

We handed Rack a 40,000 sq ft shell and a 12-month mandate. They delivered a Tier III-equivalent design with 18% headroom on power — six weeks ahead of schedule. The CFD model matched our commissioning temps within half a degree.

18 MW
critical power delivered
M
Margaret Holloway
VP of Infrastructure, Meridian Financial Group
"

Our colo lease was expiring and the landlord wanted a 40% rate increase. Rack's open-standard spec let us go to RFP across four providers. We moved to a better facility at 12% below our old rate.

12%
capex reduction vs. prior contract
D
Daniel Osei
CTO, Northgate Analytics
"

We were staring down an Uptime Institute audit with documentation that hadn't been touched in four years. Rack rebuilt our compliance matrix in three weeks. The auditors called it the most organized Tier II submission they'd seen.

1.21
PUE achieved after redesign
P
Priya Sundaram
Director of Facilities, Cascadia Health Systems